Metal Roofing Contractors Sydney
Action Roofing are experts in metal roofing restoration, re-roofing and installation of guttering and downpipes.
- 501 – Before
- 501 – After
- 502 – Before
- 502 – After
- 503 – Before
- 503 – After
- 504 – Before
- 504 – After
- 505 – Before
- 505 – After
- 506 – Before
- 506 – After
We have a large range of metal roofing profiles and accessories available from Australia’s leading manufacturers.
- Corrugated Iron
- Corrugated Iron Mini
- Square Corrugated
- Trapezoidal shapes
- Deep trough Trapezoidal shapes
- Deck and Patio concealed clip
- Deep Deck and Patio for large water volumes
- Bullnosing and Curving
- Polycarbonate Sheeting
- Fibreglass Sheeting
- Ridge Capping
- Valley Gutter
- Barge Capping
- Ventilators
- Flue Caps
- Insulation and Sarking
Our Process below ensures that interuption to your house and lifestyle are kept to a minimum so that you can remain living in your house.
- Roof is check measured and inspected for frame damage twisting and separation of timbers and termites
- All materials delivered to site
- Safety rail is installed in accordance with OH & S
- Only one section of roof will be removed & recovered the same day to insure no bad weather interference
- Old roof is removed either directly into a bin below or passed down & packed
- All old materials will be recycled enviro friendly
- Valleys will now be installed
- A set out of all new battens will be layed according to rafter spans and the type of roof being layed
- Batterns are then all levelled and nailed securely
- Heavy duty building blanket is then layed
- Then the roof is installed square according to the perimeter of the building allowing maximum coverage
- Tiles are nailed and metal is screwed
- Then all ridging is layed
- Then a clean up of all loose debris and rubbish will be removed
- Safety rail will then be removed
- A final inspection will be carried and then handed over to the customer
Asbestos Re Roofing example:
- Before Tile Roof Re-Roofed
- After Tile Roof Re-Roofed
Asbestos Roofing is carried out with the same process but the tradesmen will be suited up with protective clothing and face masks and all asbestos will be sealed in plastic and taken away to the correct safe disposal location.
All work is carried out to the Australian Standard code practice.